Yazar "Naimi, Sepanta." seçeneğine göre listele
Listeleniyor 1 - 1 / 1
Sayfa Başına Sonuç
Sıralama seçenekleri
Öğe OBSTACLES TO BUILDING INFORMATION MODELING IMPLEMENTATION(International Organization on 'Technical and Physical Problems of Engineering', 2023) Elmssri, Amal. Lamen.; Naimi, Sepanta.; Alrubaye, Zainab. Ali.Building Information Modeling (BIM) is utilized to organize everything into a single practical template when it applies to building projects. This study makes use of a questionnaire survey to learn more about the actual difficulties facing its adoption in the Libyan construction industry. The project participants were given a lot of attention to the study's design (Clients, Engineers, Managers, Contractors, Architects, etc.). The lack of widespread adoption of BIM can be attributed to several factors, which can be divided into six groups: organizational, culture, social, and economic. To examine the data and determine the greatest obstacles, we employed the following statistical methods: The Relative Importance Index (RII) is used to evaluate hypotheses, along with Cronbach's alpha, Pearson's correlation, and significance testing. The three major barriers to implementing BIM, according to this study, are a need of BIM training RII=0.853, an absence of promotion on experience RII=0.840, combined with an absence of comprehension of BIM along with its advantages RII=0.754. The biggest hurdles to project Implementation in the Libyan construction industry, ranked by category, are organizational RII=0.693, business RII=0.745, and personnel related RII=0.797. © 2023, International Organization on 'Technical and Physical Problems of Engineering'. All rights reserved.