Cost estimation for building construction projects in Libya using fuzzy AHP method

dc.contributor.advisorNaimi, Sepanta
dc.contributor.authorAlfaggi, Walid
dc.date.accessioned2023-02-16T10:23:57Z
dc.date.available2023-02-16T10:23:57Z
dc.date.issued2022en_US
dc.date.submitted2022
dc.departmentEnstitüler, Lisansüstü Eğitim Enstitüsü, İnşaat Mühendisliği Ana Bilim Dalıen_US
dc.description.abstractThe construction projects in Libya are hampered by a lack of proper data for cost estimation methods, where the majority of commonly utilized estimation approaches are still inadequate old methods. For estimating construction costs, several methods have been derived. As a result, an optimization strategy based on a well-known robust algorithm is applied. This work provides a hybrid of the analytical hierarchy process (AHP) and fuzzy theory (fuzzy AHP) for determining the best and most cost-effective roof for five different types of roofs. The Fuzzy AHP technique is used to estimate the best roof choice based on cost rank among One/two Way Flat Slab, Post-Tension Slab, Pre-Tension Slab, Waffle Slab, and Hollow Core Slab. The roofs were created employing five main factors that were implemented in a real-world situation in the Libyan building industry. The cost of materials, labor, machinery, transportation and trash on site were all considered. The findings show that the models can assist decision-makers in determining the cost rank of roof selection. When we apply a range of methods and compare them to guarantee that this is the greatest option.en_US
dc.identifier.citationAlfaggi, Walid. (2022). Cost estimation for building construction projects in Libya using fuzzy AHP method. (Yayınlanmamış yüksek lisans tezi). Altınbaş Üniversitesi, Lisansüstü Eğitim Enstitüsü, İstanbul.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12939/3349
dc.identifier.yoktezid768255
dc.institutionauthorAlfaggi, Walid
dc.language.isoen
dc.publisherAltınbaş Üniversitesi / Lisansüstü Eğitim Enstitüsüen_US
dc.relation.publicationcategoryTezen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectAHPen_US
dc.subjectFuzzy-AHPen_US
dc.subjectProject Cost Estimationen_US
dc.subjectCost Factorsen_US
dc.subjectSlab Modelen_US
dc.titleCost estimation for building construction projects in Libya using fuzzy AHP method
dc.typeMaster Thesis

Dosyalar

Lisans paketi
Listeleniyor 1 - 1 / 1
[ X ]
İsim:
license.txt
Boyut:
1.44 KB
Biçim:
Item-specific license agreed upon to submission
Açıklama:

Koleksiyon