DEVELOPING WSM-AHP METHOD FOR ADAPTIVE CONSTRUCTION PROJECT MANAGEMENT
dc.contributor.author | Ahmad, Kouther | |
dc.contributor.author | Naimi, Sepanta | |
dc.date.accessioned | 2025-02-06T18:01:22Z | |
dc.date.available | 2025-02-06T18:01:22Z | |
dc.date.issued | 2023 | |
dc.department | Altınbaş Üniversitesi | en_US |
dc.description.abstract | The management technique to keep the construction project on schedule as much as possible is to boost productivity. The construction industry's poor productivity is due in large part to its fragmented character, as well as the standard usage of Computer Aided Drafting technology, and the scale of construction businesses. This study analyses the effective variables in adaptive project performance in Iraq, which may assist address the problem of project schedule and cost in Iraq based on the nature of the effective building elements. It describes three phases of the project life cycle that affect construction projects. In building projects, prepared surveys and expert opinions were utilized to analyze effective performance elements and the extent of their influence. The information transferred from linked components evaluated by the Weighted Sum Model (WSM) was connected with the Analytic Hierarchy Process (AHP) model. In a cost-based hierarchy, the results identified the primary effective variables influencing the adaptive view and performance of the project. The matrices were designed to facilitate pairwise comparisons by experts. The WSM-AHP ranked the delay in the construction of the structure, design documentation issues, and construction phase hurdles as having a greater impact on the project performance. © 2023, International Organization on 'Technical and Physical Problems of Engineering'. All rights reserved. | en_US |
dc.identifier.endpage | 170 | en_US |
dc.identifier.issn | 2077-3528 | |
dc.identifier.issue | 4 | en_US |
dc.identifier.scopus | 2-s2.0-85183150562 | |
dc.identifier.scopusquality | Q3 | en_US |
dc.identifier.startpage | 160 | en_US |
dc.identifier.uri | https://hdl.handle.net/20.500.12939/5359 | |
dc.identifier.volume | 15 | en_US |
dc.indekslendigikaynak | Scopus | |
dc.language.iso | en | en_US |
dc.publisher | International Organization on 'Technical and Physical Problems of Engineering' | en_US |
dc.relation.ispartof | International Journal on Technical and Physical Problems of Engineering | en_US |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.snmz | KA_Scopus_20250206 | |
dc.subject | Adaptive Factors | en_US |
dc.subject | AHP | en_US |
dc.subject | WSM | en_US |
dc.title | DEVELOPING WSM-AHP METHOD FOR ADAPTIVE CONSTRUCTION PROJECT MANAGEMENT | en_US |
dc.type | Article | en_US |