Building construction schedule delays due to cost control methods

dc.contributor.authorAl-Ghuraibawi, Ahmed Mahmood Issa
dc.contributor.authorNaimi, Sepanta
dc.date.accessioned2023-02-01T08:04:52Z
dc.date.available2023-02-01T08:04:52Z
dc.date.issued2022en_US
dc.departmentEnstitüler, Lisansüstü Eğitim Enstitüsü, İnşaat Mühendisliği Ana Bilim Dalıen_US
dc.description.abstractThe building and construction sector is essential to the expansion of every nation. The client will consider a project to have been unsuccessful if it fails in meeting its goals in terms of the cost, the quality, or the timeliness. Two of the most important factors that will determine whether a project is successful are careful planning of the project and the presence of an efficient monitoring system. Cost overruns are a significant issue for contractors in many instances since they cut into the profit margin of a project and pose a broad variety of other complications for everyone involved in the endeavor [1]. These problems could not be fixed in any other way than by using efficient systems of cost control. Because of this, it is of the utmost importance to recognize techniques for decreasing costs and how their effects contribute to budget overruns [2]. An online questionnaire survey was distributed to all contractors with a rating of A1 through A5. The data were translated into quantitative values by using a combination of% age analysis and weighted score analysis. According to the findings, the most prevalent cost-control techniques, and their efficacy in lowering over-budget and overhead costs while maintaining projected profits are highlighted. Also highlighted is the fact that these measures can help ensure predicted profits. According to the Institute for Construction Training and Development (ICTAD)[3], by conducting training opportunities and awareness campaigns, CIDA could urge contractors to use cost-control strategies, and other similar endeavors. In addition, it is suggested that the submission of certain documents to the ICTAD be made mandatory.en_US
dc.identifier.citationAl-Ghuraibawi, A. M. I., Naimi, S. (2022). Building construction schedule delays due to cost control methods. International Journal on Technical and Physical Problems of Engineering, 14(1), 240-246.en_US
dc.identifier.endpage246en_US
dc.identifier.issn2077-3528
dc.identifier.issue4en_US
dc.identifier.scopus2-s2.0-85146177697
dc.identifier.scopusqualityQ3
dc.identifier.startpage240en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12939/3210
dc.identifier.volume14en_US
dc.indekslendigikaynakScopus
dc.institutionauthorAl-Ghuraibawi, Ahmed Mahmood Issa
dc.institutionauthorNaimi, Sepanta
dc.language.isoen
dc.publisherInternational Organization on 'Technical and Physical Problems of Engineering'en_US
dc.relation.ispartofInternational Journal on Technical and Physical Problems of Engineering
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - İdari Personel ve Öğrencien_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectBudget Overrunen_US
dc.subjectConstructionen_US
dc.subjectCost Controlen_US
dc.subjectCost Control Methoden_US
dc.subjectICTADen_US
dc.titleBuilding construction schedule delays due to cost control methods
dc.typeArticle