Developing adaptive project construction cost control using multi-nonlinear regression engineering techniques

dc.contributor.authorMaaroof, Maaroof Aqeel Maaroof
dc.contributor.authorNaimi, Sepanta
dc.date.accessioned2023-06-23T11:45:17Z
dc.date.available2023-06-23T11:45:17Z
dc.date.issued2023en_US
dc.departmentEnstitüler, Lisansüstü Eğitim Enstitüsü, İnşaat Mühendisliği Ana Bilim Dalıen_US
dc.description.abstractConstruction project management using the techniques of multi-nonlinear regression method was the branch that the study dealt with in its pathway. The study identified and evaluated the impact of various factors like the project elements including the building specification impact, the building location effect, the soil effect, and the construction process factor impacts. on the cost of the project. the study analyzed the data toward building an effective model based on multi-nonlinear regression method for controlling the project from the initial phase toward the final implementation stage. The study outline was to reach adaptive management of the construction project under the conditions in Iraq to enhance the performance of the management team in the construction sector. The findings show that using a project control's actual values improves project management teams' capacity to recognize cost and schedule concerns on time.en_US
dc.identifier.citationMaaroof, M. A. M., & Naimi, S. (2023). Developing adaptive project construction cost control using multi-nonlinear regression engineering techniques. International Journal of Intelligent Systems and Applications in Engineering, 11(4s), 579-586.en_US
dc.identifier.endpage586en_US
dc.identifier.issn2147-6799
dc.identifier.issue4sen_US
dc.identifier.scopus2-s2.0-85161358869
dc.identifier.scopusqualityQ3
dc.identifier.startpage579en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12939/3550
dc.identifier.volume11en_US
dc.indekslendigikaynakScopus
dc.institutionauthorMaaroof, Maaroof Aqeel Maaroof
dc.institutionauthorNaimi, Naimi, Sepanta
dc.language.isoen
dc.relation.ispartofInternational Journal of Intelligent Systems and Applications in Engineering
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - İdari Personel ve Öğrencien_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectActual Valueen_US
dc.subjectMulti-Nonlinear Regression Methoden_US
dc.subjectPlanning Valueen_US
dc.titleDeveloping adaptive project construction cost control using multi-nonlinear regression engineering techniques
dc.typeArticle