A new model for cost estimation construction project using Hybrid importance regression ensemble method

dc.contributor.authorAlkhuadhan, Ali Najah Abdulkadhim
dc.contributor.authorNaimi, Sepanta
dc.date.accessioned2023-07-21T08:28:59Z
dc.date.available2023-07-21T08:28:59Z
dc.date.issued2023en_US
dc.departmentEnstitüler, Lisansüstü Eğitim Enstitüsü, İnşaat Mühendisliği Ana Bilim Dalıen_US
dc.description.abstractCost estimating entails gathering and evaluating historical data, as well as using quantitative models, methodologies, tools, and databases to forecast the cost of a program in the future. At the early stages of the building design process, the cost is considered one of the most important elements in making decisions. During the design phase of a project, cost estimating is quite essential. To compelet a construction project successfully, it is critical to design a usable model and method for cost estimation in construction projects. For the above reason, this study has developed a hybrid method to conduct an accurate cost estimation in construction projects in Iraq. This study also conducted a rigorous survey to find five main influential factors with thirty-six sub-factors in the Iraqi market. It was evaluated through previous studies, questionnaires, and surveys of twenty projects to build a matrix factors database for construction projects. This work gathered the construction cost factors from relevant research and expert views. In the second step, the researcher ranked the factors within the Importance Regression Ensemble Method then the K-Nearest Neighbor Method was applied to specify the effect of the near-effective factors on the cost. The outcome of this study will be helpful to construction professionals in estimating a construction project effectively.en_US
dc.identifier.citationAlkhuadhan, A. N. A., Naimi, S. (2023). A new model for cost estimation construction project using Hybrid importance regression ensemble method. Acta Logistica, 10(2), 191-198. 10.22306/al.v10i2.372en_US
dc.identifier.endpage198en_US
dc.identifier.issn1339-5629
dc.identifier.issue2en_US
dc.identifier.scopusqualityQ3
dc.identifier.startpage191en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12939/3566
dc.identifier.volume10en_US
dc.identifier.wosWOS:001023828800004
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.institutionauthorAlkhuadhan, Ali Najah Abdulkadhim
dc.institutionauthorNaimi, Sepanta
dc.language.isoen
dc.relation.ispartofActa Logistica
dc.relation.isversionof10.22306/al.v10i2.372en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - İdari Personel ve Öğrencien_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectConstructionen_US
dc.subjectCost factoren_US
dc.subjectImportance Regression Ensemble Methoden_US
dc.subjectK-Nearest Neighbor Methoden_US
dc.titleA new model for cost estimation construction project using Hybrid importance regression ensemble method
dc.typeArticle

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
Ä°sim:
II_2023_04_Alkhuadhan_Naimi.pdf
Boyut:
165.28 KB
Biçim:
Adobe Portable Document Format
Açıklama:
Tam Metin / Full Text
Lisans paketi
Listeleniyor 1 - 1 / 1
[ X ]
Ä°sim:
license.txt
Boyut:
1.44 KB
Biçim:
Item-specific license agreed upon to submission
Açıklama: